The flame in the furnace can be looked at through colored glasses.
可以通过有色眼镜观看高炉内的火焰。
The flame in the furnace can be looked at through colored glasses.
可以通过有色眼镜观看高炉内的火焰。
The annual output of water granulated slag produced from ferromanganese blastfurnace in xiangtan manganese mine is 0.2Mt.
湘潭锰矿的锰铁高炉水渣年产量约20万t,属碱性高炉水渣,具有较高的活性。
On this basis of the research, the fragmentized mechanism of coke in a blast furnace is analyzed.
在此基础上,从理论上高炉用焦炭的破碎机理。
The medium and small - sized furnace stack gunning with unshaped refractory materials is a new repatching technology.
中小型高炉炉身内衬喷补是采用不定型耐火材料以喷射法修复炉身的一项新技术。
Problems of lead-zinc-aluminium scalings in washing water system for blast furnaces gas are analyzed. The solving methods are given.
针对酒钢高炉煤气洗涤水系统结锌铝垢问题,进行
探讨,并提出
解决该问题的办法。
This article concludes the test result and production experience of the internal puddler aboutinjecting the bituminous and anthracite mixed coal.
本文归纳国内炼铁工作者关于高炉喷吹烟无混合煤的试验结果和生产经验。
The percentage of standard taphole arose from 83% to 100% after the taphole clay was used to tapholes of blast furnace.
高炉使用这种高性能有水炮泥后,铁口合格率由以前的83%提高到100%。
Rhenate of ammonia, rhenate of potassium, oxide of calcium, oxide of molybdenum, rich-manganese slag, spiegeleisen(containing manganese), lime, lead sulfide, electrode paste.
鳞酸铵、鳞酸钾、氧钙、氧
钼、高炉富锰渣、镜铁(含锰)、白灰、硫
、
极糊。
The hot air is always carried to the furnace by a powerful turboblower, through the hot blast main, bustle pipe, bootleg, blowpipe and tuyere.
热风由功率强大的鼓风机通过热风总管、环形风管、风口小弯管、直吹管和风口不断鼓人高炉。
Blast furnace slags were partially replaced by artificial and natural pozzolanic materials, such as pozzolan , fly ash and zeolite,to produce alkali activated slag cement(AASC).
用人工和天然火山灰质材料(如火山灰、粉煤灰和沸石)替代部高炉矿渣制造碱矿渣水泥。
The calculation of carbon content of unconsumed pulverized coal in the dust under different PCI rate was carried out based on microscopic and chemical analysis results.
根据岩相显微和
学
的结果,计算
宝钢高炉不同煤比操作条件下,炉尘中未消耗煤粉中的碳含量。
The feasibility of roasting reduction method to dezinc the Zn bearing BF dust was proved by energy spectrum analysis and differential thermal(DT) and thermo gravimetric(TG) analysis firstly.
通过能谱、差热及热重等验证
用还原焙烧的方法脱除高炉含锌粉尘中锌的可行性。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对高炉WZ-C无料钟炉顶装料设备存在的布料器温度高、透水等问题进行原因
,并进行水冷、水封系统改进。
This paper,by using analysable method of static balance,presents the calculated balance position and balance mass of large bell for blast furnace,so as to improve installational speed and quality.
文章采用静平衡的方法,给出
高炉大钟的平衡位置和平衡质量的计算方法,可以有效提高大钟的安装速度和质量。
TPCO Iron-making Subsidiary adopts a stoppage method of dropping the stock level with vacant stockline to expose the staves inside the blast furnace in order to replace the damaged ones.
介绍天津钢管制铁有限公司为
更换高炉损坏的冷却壁,采取
空料线降料面的停炉方法裸露冷却壁的实践。
声明:以上例句、词性类均由互联网资源自动生成,部
未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。