It has found reasonable ways brought roadbed to resultant stabilization owning to synthesize many factors such as earthiness,hydroclimate,wheather etc to find self weight and external load of roadbed.
本文结合大齐公路施工实例,论述了合理的通车碾压工后沉降期及约因素,综合了土质水文、
候天
等
约因素,以寻
路
自重外荷载作用,使路
达到最终稳定的合理途径。