Coal mine rockbolt shoring current situation,necessity and significance having discussed rockbolt shoring parameter optimization design combining with leaping forward.
Excavate coal is primary production link in coal mine production, therefor, Weaving excavate coal working face supersedure plan has instructional meaning.
The paper intrduces the exchange CENTREX, dispatching equipment and the com-bination of them, and puts forward the methods of improving coalmining communication capabili-ty.
The problems existed in electric supply protection for coal mine are introduced,and the features and result of the computerisation reform plan are provided.
Large scale planar geological mapping, profiling survey and microfabric analyses proved that lithophysa structure was developed in rhyolite in Yingcheng coal mine area, Jiutai City.
Aiming at difficulties in supporting dilatable soft rock roadway, control method was put forward to control effectively deformation and failure of dilatable soft rock roadway in Hongmiao Colliery.
For the purpose of the development and utilization of the argilla re sources in Huaibei, the activation of coal-argilla taken from Zhuzhuang coal mi ne was studied as representative sample.