The flame in the furnace can be looked at through colored glasses.
可以通过有色眼镜观看高内
火焰。
The flame in the furnace can be looked at through colored glasses.
可以通过有色眼镜观看高内
火焰。
The annual output of water granulated slag produced from ferromanganese blastfurnace in xiangtan manganese mine is 0.2Mt.
湘潭锰矿锰铁高
渣年产量约20万t,属碱性高
渣,具有较高
活性。
On this basis of the research, the fragmentized mechanism of coke in a blast furnace is analyzed.
在此基础上,从理论上分析了高用焦炭
破碎机理。
The medium and small - sized furnace stack gunning with unshaped refractory materials is a new repatching technology.
中小型高内衬喷补是采用不定型耐火材料以喷射法修复
一项新技术。
Problems of lead-zinc-aluminium scalings in washing water system for blast furnaces gas are analyzed. The solving methods are given.
针对酒钢高煤气洗涤
系统结铅锌铝垢问题,进行了分析探讨,并提出了解决该问题
办法。
This article concludes the test result and production experience of the internal puddler aboutinjecting the bituminous and anthracite mixed coal.
本文归纳了国内炼铁工作者关于高喷吹烟无混合煤
试验结果和生产经验。
The percentage of standard taphole arose from 83% to 100% after the taphole clay was used to tapholes of blast furnace.
高使用这种高性能有
后,铁口合格率由以前
83%提高到100%。
Rhenate of ammonia, rhenate of potassium, oxide of calcium, oxide of molybdenum, rich-manganese slag, spiegeleisen(containing manganese), lime, lead sulfide, electrode paste.
鳞酸铵、鳞酸钾、氧化钙、氧化钼、高富锰渣、镜铁(含锰)、白灰、硫化铅、电极糊。
The hot air is always carried to the furnace by a powerful turboblower, through the hot blast main, bustle pipe, bootleg, blowpipe and tuyere.
热风由功率强大鼓风机通过热风总管、环形风管、风口小弯管、直吹管和风口不断鼓人高
。
Blast furnace slags were partially replaced by artificial and natural pozzolanic materials, such as pozzolan , fly ash and zeolite,to produce alkali activated slag cement(AASC).
用人工和天然火山灰质材料(如火山灰、粉煤灰和沸石)替代部分高矿渣制造碱矿渣
。
The calculation of carbon content of unconsumed pulverized coal in the dust under different PCI rate was carried out based on microscopic and chemical analysis results.
根据岩相显微分析和化学分析结果,计算了宝钢高
不同煤比操作条件下,
尘中未消耗煤粉中
碳含量。
The feasibility of roasting reduction method to dezinc the Zn bearing BF dust was proved by energy spectrum analysis and differential thermal(DT) and thermo gravimetric(TG) analysis firstly.
通过能谱、差热及热重分析等验证了用还原焙烧方法脱除高
含锌粉尘中锌
可行性。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对高WZ-C无料钟
顶装料设备存在
布料器温度高、透
等问题进行了原因分析,并进行
冷、
封系统改进。
This paper,by using analysable method of static balance,presents the calculated balance position and balance mass of large bell for blast furnace,so as to improve installational speed and quality.
文章采用静平衡分析方法,给出了高
大钟
平衡位置和平衡质量
计算方法,可以有效提高大钟
安装速度和质量。
TPCO Iron-making Subsidiary adopts a stoppage method of dropping the stock level with vacant stockline to expose the staves inside the blast furnace in order to replace the damaged ones.
介绍了天津钢管制铁有限公司为了更换高损坏
冷却壁,采取了空料线降料面
停
方法裸露冷却壁
实践。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。